OF INTEREST: ​Second delivery of components to ITER

On 18 September, three trucks arrived from Italy loaded with equipment for ITER’s Steady State Electrical Network (SSEN). The high voltage disconnectors and earthing switches were procured by the Princeton Plasma Physics Laboratory (PPPL), which serves as the SSEN engineering support subcontractor to the US Domestic Agency, and manufactured by the Italian branch of Alstom.